2009•Shanxi ArchitectureRequires access

The monitoring technology and analysis of urban subway intersection tunnel

Liu Bo-fen

Open publisher page 0 citations

Abstract

Combined with the intersection tunnel construction practice of No.3 subway line in Shenzhen,the monitoring measuring scheme design and implementing method of subway tunnel structural displacement and settlement were discussed,and specific proper monitoring measures and forecasting procedure were proposed.The practice proved that the monitoring effect was reliable,which provided reliable technical warrant for the tunnel smooth cutting through.

About this research paper

What this paper is about

Combined with the intersection tunnel construction practice of No.3 subway line in Shenzhen,the monitoring measuring scheme design and implementing method of subway tunnel structural displacement and settlement were discussed,and specific proper monitoring measures and forecasting procedure were proposed.The practice proved that the monitoring effect was reliable,which provided reliable technical warrant for the tunnel smooth cutting through.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combined with the intersection tunnel construction practice of No.3 subway line in Shenzhen,the monitoring measuring scheme design and implementing method of subway tunnel structural displacement and settlement were discussed,and specific proper monitoring measures and forecasting procedure were proposed.The practice proved that the monitoring effect was reliable,which provided reliable technical warrant for the tunnel smooth cutting through.

Key concepts: Intersection (aeronautics), Settlement (finance), Warrant, Engineering, Displacement (psychology), Civil engineering, Transport engineering, Line (geometry)

Related papers

Back to paper searchBrowse research topicsOriginal source
The monitoring technology and analysis of urban subway intersection tunnel — Research Paper | ScholarLens