The monitoring technology and analysis of urban subway intersection tunnel
Liu Bo-fen
Abstract
Liu Bo-fen
Abstract
Combined with the intersection tunnel construction practice of No.3 subway line in Shenzhen,the monitoring measuring scheme design and implementing method of subway tunnel structural displacement and settlement were discussed,and specific proper monitoring measures and forecasting procedure were proposed.The practice proved that the monitoring effect was reliable,which provided reliable technical warrant for the tunnel smooth cutting through.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with the intersection tunnel construction practice of No.3 subway line in Shenzhen,the monitoring measuring scheme design and implementing method of subway tunnel structural displacement and settlement were discussed,and specific proper monitoring measures and forecasting procedure were proposed.The practice proved that the monitoring effect was reliable,which provided reliable technical warrant for the tunnel smooth cutting through.
Key concepts: Intersection (aeronautics), Settlement (finance), Warrant, Engineering, Displacement (psychology), Civil engineering, Transport engineering, Line (geometry)