The Cause of Excessive or Insufficient Excavation in Tunnel Construction and Its Control

Liu Ming-gao

Open publisher page 1 citations

Abstract

In the tunnel construction by drill-blast method, excessive or insufficient excavation is ineluctable. It has not only important influence on the work quality and the safe progress in the tunnel construction, but also on the economic benefit in tunnel engineering. This article based on the engineering practice, analyzes five main factors affecting the excessive or insufficient excavation:drill precision, the act of measuring, blasting technology, the geology of wall rock and real - time management, and the relevant technology of its control is put forward.

About this research paper

What this paper is about

In the tunnel construction by drill-blast method, excessive or insufficient excavation is ineluctable. It has not only important influence on the work quality and the safe progress in the tunnel construction, but also on the economic benefit in tunnel engineering. This article based on the engineering practice, analyzes five main factors affecting the excessive or insufficient excavation:drill precision, the act of measuring, blasting technology, the geology of wall rock and real - time management, and the relevant technology of its control is put forward.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In the tunnel construction by drill-blast method, excessive or insufficient excavation is ineluctable. It has not only important influence on the work quality and the safe progress in the tunnel construction, but also on the economic benefit in tunnel engineering. This article based on the engineering practice, analyzes five main factors affecting the excessive or insufficient excavation:drill precision, the act of measuring, blasting technology, the geology of wall rock and real - time management, and the relevant technology of its control is put forward.

Key concepts: Excavation, Rock blasting, Drill, Engineering, Tunnel construction, Drilling and blasting, Work (physics), Quality (philosophy)