Research on design and construction scheme of rectangular aqueduct of Middle Route Project of S-N Water Diversion

Shiping Li

Open publisher page 0 citations

Abstract

Taocha-Lushan section of Middle Route Project of S-N Water Diversion crosses plain area,and the construction of aqueduct is needed for water conveyance.In aqueduct design over Lihe River,for its long span,large design discharge and high requirement of engineering quality and durability,through comparison and optimization of schemes and types,the design of simply-support prestressed structure with rectangular open box-beam cross-section and the reinforced concrete hollow structure for pier are adopted.According to terrain condition of wide flood plain,sectioned assembling box-beam and bridge fabrication machine are chosen for construction.The procedure and construction technology for applying prestress of structure in precast stage are described in detail.

About this research paper

What this paper is about

Taocha-Lushan section of Middle Route Project of S-N Water Diversion crosses plain area,and the construction of aqueduct is needed for water conveyance.In aqueduct design over Lihe River,for its long span,large design discharge and high requirement of engineering quality and durability,through comparison and optimization of schemes and types,the design of simply-support prestressed structure with rectangular open box-beam cross-section and the reinforced concrete hollow structure for pier are adopted.According to terrain condition of wide flood plain,sectioned assembling box-beam and bridge fabrication machine are chosen for construction.The procedure and construction technology for applying prestress of structure in precast stage are described in detail.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taocha-Lushan section of Middle Route Project of S-N Water Diversion crosses plain area,and the construction of aqueduct is needed for water conveyance.In aqueduct design over Lihe River,for its long span,large design discharge and high requirement of engineering quality and durability,through comparison and optimization of schemes and types,the design of simply-support prestressed structure with rectangular open box-beam cross-section and the reinforced concrete hollow structure for pier are adopted.According to terrain condition of wide flood plain,sectioned assembling box-beam and bridge fabrication machine are chosen for construction.The procedure and construction technology for applying prestress of structure in precast stage are described in detail.

Key concepts: Aqueduct, Precast concrete, Water diversion, Engineering, Pier, Culvert, Prestressed concrete, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on design and construction scheme of rectangular aqueduct of Middle Route Project of S-N Water Diversion — Research Paper | ScholarLens