Summary of Running and Operation of Aqueduct Building Machine for U- shaped Aqueduct with Large Span and Thin Wall

Zhou Ji-hon

Open publisher page 0 citations

Abstract

the operational technology on the aqueduct building machine( model: DZ40 /1600) for construction of the u- shaped aqueduct with large span and thin wall on the aqueduct over the Tuan River on the middle route of the south- to- north water diversion project is proved reasonable and simple through the site practice and continuous optimization of the machine,satisfying the engineering design requirements. The aqueduct body after being constructed and measured meets the design requirements in terms of structural sizes and construction quality. Therefore,application of this aqueduct building machine accumulates experience for the construction of the large aqueducts.

About this research paper

What this paper is about

the operational technology on the aqueduct building machine( model: DZ40 /1600) for construction of the u- shaped aqueduct with large span and thin wall on the aqueduct over the Tuan River on the middle route of the south- to- north water diversion project is proved reasonable and simple through the site practice and continuous optimization of the machine,satisfying the engineering design requirements. The aqueduct body after being constructed and measured meets the design requirements in terms of structural sizes and construction quality. Therefore,application of this aqueduct building machine accumulates experience for the construction of the large aqueducts.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

the operational technology on the aqueduct building machine( model: DZ40 /1600) for construction of the u- shaped aqueduct with large span and thin wall on the aqueduct over the Tuan River on the middle route of the south- to- north water diversion project is proved reasonable and simple through the site practice and continuous optimization of the machine,satisfying the engineering design requirements. The aqueduct body after being constructed and measured meets the design requirements in terms of structural sizes and construction quality. Therefore,application of this aqueduct building machine accumulates experience for the construction of the large aqueducts.

Key concepts: Aqueduct, Span (engineering), Engineering, Water diversion, Structural engineering, Civil engineering, Geography, Water resource management

Related papers

Back to paper searchBrowse research topicsOriginal source
Summary of Running and Operation of Aqueduct Building Machine for U- shaped Aqueduct with Large Span and Thin Wall — Research Paper | ScholarLens