2009Ningxia Engineering TechnologyRequires access

Two-way prestressed technology applied in Tanglai channels through Beita lake large-scale aqueduct

Zhuo Li

Open publisher page 0 citations

Abstract

In view of particularity of the Beita Lake aqueduct, which crosses Tanglai channels, the two-way prestressed technology is adopted,and after sidewalks in large span structures of aqueduct is prefabricated and hoisted,secondary floor is poured in design and construction plan. The result shows the comprehensive function of aqueduct is implemented in complicated conditions,such as short construction period,larger span of structures,navigation under aqueduct,prefabrication and hoisting of large sidewall.

About this research paper

What this paper is about

In view of particularity of the Beita Lake aqueduct, which crosses Tanglai channels, the two-way prestressed technology is adopted,and after sidewalks in large span structures of aqueduct is prefabricated and hoisted,secondary floor is poured in design and construction plan. The result shows the comprehensive function of aqueduct is implemented in complicated conditions,such as short construction period,larger span of structures,navigation under aqueduct,prefabrication and hoisting of large sidewall.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In view of particularity of the Beita Lake aqueduct, which crosses Tanglai channels, the two-way prestressed technology is adopted,and after sidewalks in large span structures of aqueduct is prefabricated and hoisted,secondary floor is poured in design and construction plan. The result shows the comprehensive function of aqueduct is implemented in complicated conditions,such as short construction period,larger span of structures,navigation under aqueduct,prefabrication and hoisting of large sidewall.

Key concepts: Aqueduct, Engineering, Span (engineering), Prefabrication, Civil engineering, Structural engineering, Plan (archaeology), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Two-way prestressed technology applied in Tanglai channels through Beita lake large-scale aqueduct — Research Paper | ScholarLens