The application of the dynamic compaction on the high fill subgrade construction

Jian Tang

Open publisher page 0 citations

Abstract

The high fill subgrade center in the Dapingpo section of the freeway that from Qingzhen to Zhenning reach more than 30 metres highly,the hidden trouble of the basis has three: the karst crevasse,the high liquid limit clay,the small limestone cave.Through dynamic compaction construction on the subgrade,sped up the ground solidifying speed,reduced the ground solidifying time,this subgrade processing means effectively controlled the settlement of the subgrade,guaranteed the subgrade stability by settlement observation of the subgrade.

About this research paper

What this paper is about

The high fill subgrade center in the Dapingpo section of the freeway that from Qingzhen to Zhenning reach more than 30 metres highly,the hidden trouble of the basis has three: the karst crevasse,the high liquid limit clay,the small limestone cave.Through dynamic compaction construction on the subgrade,sped up the ground solidifying speed,reduced the ground solidifying time,this subgrade processing means effectively controlled the settlement of the subgrade,guaranteed the subgrade stability by settlement observation of the subgrade.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The high fill subgrade center in the Dapingpo section of the freeway that from Qingzhen to Zhenning reach more than 30 metres highly,the hidden trouble of the basis has three: the karst crevasse,the high liquid limit clay,the small limestone cave.Through dynamic compaction construction on the subgrade,sped up the ground solidifying speed,reduced the ground solidifying time,this subgrade processing means effectively controlled the settlement of the subgrade,guaranteed the subgrade stability by settlement observation of the subgrade.

Key concepts: Subgrade, Geotechnical engineering, Settlement (finance), Compaction, Geology, Dynamic compaction, Engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
The application of the dynamic compaction on the high fill subgrade construction — Research Paper | ScholarLens