The application of the dynamic compaction on the high fill subgrade construction
Jian Tang
Abstract
Jian Tang
Abstract
The high fill subgrade center in the Dapingpo section of the freeway that from Qingzhen to Zhenning reach more than 30 metres highly,the hidden trouble of the basis has three: the karst crevasse,the high liquid limit clay,the small limestone cave.Through dynamic compaction construction on the subgrade,sped up the ground solidifying speed,reduced the ground solidifying time,this subgrade processing means effectively controlled the settlement of the subgrade,guaranteed the subgrade stability by settlement observation of the subgrade.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The high fill subgrade center in the Dapingpo section of the freeway that from Qingzhen to Zhenning reach more than 30 metres highly,the hidden trouble of the basis has three: the karst crevasse,the high liquid limit clay,the small limestone cave.Through dynamic compaction construction on the subgrade,sped up the ground solidifying speed,reduced the ground solidifying time,this subgrade processing means effectively controlled the settlement of the subgrade,guaranteed the subgrade stability by settlement observation of the subgrade.
Key concepts: Subgrade, Geotechnical engineering, Settlement (finance), Compaction, Geology, Dynamic compaction, Engineering, Computer science