The penstock for Jinhe Hydropower Station is less in China, as it has a obliquity of 50° on the bending and inclined straight section in space; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance.

About this research paper

What this paper is about

The penstock for Jinhe Hydropower Station is less in China, as it has a obliquity of 50° on the bending and inclined straight section in space; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The penstock for Jinhe Hydropower Station is less in China, as it has a obliquity of 50° on the bending and inclined straight section in space; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance.

Key concepts: Penstock, Hydropower, Civil engineering, Engineering, Section (typography), Structural engineering, Computer science, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Manufacture and installation method of penstock for Jinhe Hydropower Station — Research Paper | ScholarLens