Installation technology of high head and thick-wall penstock for Nanshan I hydropower project

Baoyu Hu

Open publisher page 0 citations

Abstract

Nanshan hydropower project is located in the remote Nanshan mountains in Guanxi province,with complicated topography and thick plants.It is the first time in China that open-laid high head penstock is of Q390C low-alloy steel with 58mm thick wall.To ensure the installation quality,careful assessment was made on welding technology of Q390C low-alloy steel as the base metal of penstock before installation.The technical option on installation,welding and water pressure tests is continuously optimized and improved in the process of installation,so that the penstock installation is carried out successfully.

About this research paper

What this paper is about

Nanshan hydropower project is located in the remote Nanshan mountains in Guanxi province,with complicated topography and thick plants.It is the first time in China that open-laid high head penstock is of Q390C low-alloy steel with 58mm thick wall.To ensure the installation quality,careful assessment was made on welding technology of Q390C low-alloy steel as the base metal of penstock before installation.The technical option on installation,welding and water pressure tests is continuously optimized and improved in the process of installation,so that the penstock installation is carried out successfully.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Nanshan hydropower project is located in the remote Nanshan mountains in Guanxi province,with complicated topography and thick plants.It is the first time in China that open-laid high head penstock is of Q390C low-alloy steel with 58mm thick wall.To ensure the installation quality,careful assessment was made on welding technology of Q390C low-alloy steel as the base metal of penstock before installation.The technical option on installation,welding and water pressure tests is continuously optimized and improved in the process of installation,so that the penstock installation is carried out successfully.

Key concepts: Penstock, Hydropower, Welding, Head (geology), Engineering, Geology, Mining engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Installation technology of high head and thick-wall penstock for Nanshan I hydropower project — Research Paper | ScholarLens