2005Qiaoliang jiansheRequires access

Construction of In-Water Pier Foundations of Tantai Lake Bridge

Wang Qing-zeng

Open publisher page 0 citations

Abstract

The superstructure of the main bridge of Tantai Lake Bridge is a hybrid structure of steel tube arch and prestressed concrete continuous box girders with span arrangement (40 + 96 + 40) m, and that of the approach spans on either south or north side of the Bridge are also prestressed concrete continuous box girders, with foundations of the overall bridge designed as bored piles. In this paper, the comparison and selection of artificial island schemes for construction of the bored pile foundations of the in-water piers are presented, and the technical problems encountered in the construction of the bored piles, pile caps, and solutions to the problems are described as well. The experiences from the construction of the pile foundations herewith may be of certain reference to the construction of the type of foundations of in-water piers elsewhere.

About this research paper

What this paper is about

The superstructure of the main bridge of Tantai Lake Bridge is a hybrid structure of steel tube arch and prestressed concrete continuous box girders with span arrangement (40 + 96 + 40) m, and that of the approach spans on either south or north side of the Bridge are also prestressed concrete continuous box girders, with foundations of the overall bridge designed as bored piles. In this paper, the comparison and selection of artificial island schemes for construction of the bored pile foundations of the in-water piers are presented, and the technical problems encountered in the construction of the bored piles, pile caps, and solutions to the problems are described as well. The experiences from the construction of the pile foundations herewith may be of certain reference to the construction of the type of foundations of in-water piers elsewhere.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The superstructure of the main bridge of Tantai Lake Bridge is a hybrid structure of steel tube arch and prestressed concrete continuous box girders with span arrangement (40 + 96 + 40) m, and that of the approach spans on either south or north side of the Bridge are also prestressed concrete continuous box girders, with foundations of the overall bridge designed as bored piles. In this paper, the comparison and selection of artificial island schemes for construction of the bored pile foundations of the in-water piers are presented, and the technical problems encountered in the construction of the bored piles, pile caps, and solutions to the problems are described as well. The experiences from the construction of the pile foundations herewith may be of certain reference to the construction of the type of foundations of in-water piers elsewhere.

Key concepts: Pile, Pier, Engineering, Bridge (graph theory), Beam bridge, Girder, Prestressed concrete, Span (engineering)

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction of In-Water Pier Foundations of Tantai Lake Bridge — Research Paper | ScholarLens