Construction Techniques for Large Bored Pile Foundations in Deep Water in Tidal Reach

Long Huang

Open publisher page 0 citations

Abstract

This paper describes the key techniques employed for construction of the large bored pile foundations in deep water for pylon piers of Sutong Changjiang River Bridge, such as the integral floating and positioning of the steel boxed cofferdams (to be also used as boring platforms), construction process of the extremely long bored piles (steel casings of the piles were driven very deep into the riverbed), construction of huge pier bases and riverbed protection during the construction.

About this research paper

What this paper is about

This paper describes the key techniques employed for construction of the large bored pile foundations in deep water for pylon piers of Sutong Changjiang River Bridge, such as the integral floating and positioning of the steel boxed cofferdams (to be also used as boring platforms), construction process of the extremely long bored piles (steel casings of the piles were driven very deep into the riverbed), construction of huge pier bases and riverbed protection during the construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper describes the key techniques employed for construction of the large bored pile foundations in deep water for pylon piers of Sutong Changjiang River Bridge, such as the integral floating and positioning of the steel boxed cofferdams (to be also used as boring platforms), construction process of the extremely long bored piles (steel casings of the piles were driven very deep into the riverbed), construction of huge pier bases and riverbed protection during the construction.

Key concepts: Cofferdam, Pile, Pier, Pylon, Deep water, Bridge (graph theory), Engineering, Pile cap