Measures of boiler feedwater pumps being put into high pressure feedwater system during unit operation
Yuan Ma
Abstract
Yuan Ma
Abstract
It discusses about the four boiler feedwater pumps of HEJIN power plant two 350MW units manufactared by MITSUBISHI Company in JAPAN,analyse and diagnose the feedwater pump abnomal during turbine operation, some measures and adjustments are taken,the effectiveness is obvious,meantime the experience is good to the same pumps or equipments.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
It discusses about the four boiler feedwater pumps of HEJIN power plant two 350MW units manufactared by MITSUBISHI Company in JAPAN,analyse and diagnose the feedwater pump abnomal during turbine operation, some measures and adjustments are taken,the effectiveness is obvious,meantime the experience is good to the same pumps or equipments.
Key concepts: Boiler feedwater, Boiler feedwater pump, Feedwater heater, Boiler (water heating), Engineering, Turbine, Power station, Waste management