Design optimization of the foundation pit support design scheme
Xiaoqian Yang
Abstract
Xiaoqian Yang
Abstract
Through analyzing the engineering geology condition,cement mixing pile as water-stop curtain and foundation pit support scheme within the pit and watering well water-stop curtain scheme within foundation pit are proposed.Simultaneously,strict construction requirements are demanded for the design technique and earth excavation.In the end,foundation pit deformation monitoring proves that the design scheme meets construction requirements.And excavation testifies that the design meets the design requirement.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Through analyzing the engineering geology condition,cement mixing pile as water-stop curtain and foundation pit support scheme within the pit and watering well water-stop curtain scheme within foundation pit are proposed.Simultaneously,strict construction requirements are demanded for the design technique and earth excavation.In the end,foundation pit deformation monitoring proves that the design scheme meets construction requirements.And excavation testifies that the design meets the design requirement.
Key concepts: Foundation (evidence), Excavation, Engineering, Scheme (mathematics), Civil engineering, Pile, Geotechnical engineering, Construction engineering