Optimization in Design Scheme Implementation Process of a Deep Foundation Pit Supporting
Hang Guo
Abstract
Hang Guo
Abstract
According to the deformation in a deep foundation pit excavation process,analysis was made on the basic cause of engineering foundation pit deformation;the reasonable optimizations were timely implemented on the original design scheme with effective limits to the deformation of foundation pit with the safety ensuring on surrounding buildings of the foundation pit,cost saving,convenient construction and short construction period.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the deformation in a deep foundation pit excavation process,analysis was made on the basic cause of engineering foundation pit deformation;the reasonable optimizations were timely implemented on the original design scheme with effective limits to the deformation of foundation pit with the safety ensuring on surrounding buildings of the foundation pit,cost saving,convenient construction and short construction period.