Application of combination system of pileanchor adding water-stop curtain in deep foundation pit
Liang Ren-wan
Abstract
Liang Ren-wan
Abstract
Through analyzing the engineering case,the paper puts forward design scheme,and discusses the construction technology.Through in-situ experiment and detection,if finds out that the bracing system is stable,displacement and settlement surrounding the foundation basically meets design demands,water-stop of the foundation pit reaches the design and construction requirements,and cost is low,and operation is successful as well.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Through analyzing the engineering case,the paper puts forward design scheme,and discusses the construction technology.Through in-situ experiment and detection,if finds out that the bracing system is stable,displacement and settlement surrounding the foundation basically meets design demands,water-stop of the foundation pit reaches the design and construction requirements,and cost is low,and operation is successful as well.
Key concepts: Foundation (evidence), Bracing, Engineering, Settlement (finance), Displacement (psychology), Construction engineering, Civil engineering, Computer science