2012Shuili shuidian ke-ji jinzhanRequires access

Blasting test of underground workshop's rock anchor crane beam for Jinping Secondary Hydropower Station

Zhang Liang-gang

Open publisher page 0 citations

Abstract

For formation of a better quality rock bench in the blasting excavation of an underground workshop's rock anchor crane beam for the Jingping Secondary Hydropower Station,optimization of drilling and blasting parameters as well as the charging constitution was carried out through extensive comparative tests with different schemes and blasting vibration monitoring.The results indicate that the blasting effect of 30 cm hole spacing is better than that of 40 cm hole spacing.Furthermore,the coupling coefficient of 30 cm hole spacing is also greater than that of 40 cm hole spacing.Therefore,an increased coupling coefficient could lead to a smoother rock surface and less damage induced by the blasting vibration.

About this research paper

What this paper is about

For formation of a better quality rock bench in the blasting excavation of an underground workshop's rock anchor crane beam for the Jingping Secondary Hydropower Station,optimization of drilling and blasting parameters as well as the charging constitution was carried out through extensive comparative tests with different schemes and blasting vibration monitoring.The results indicate that the blasting effect of 30 cm hole spacing is better than that of 40 cm hole spacing.Furthermore,the coupling coefficient of 30 cm hole spacing is also greater than that of 40 cm hole spacing.Therefore,an increased coupling coefficient could lead to a smoother rock surface and less damage induced by the blasting vibration.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

For formation of a better quality rock bench in the blasting excavation of an underground workshop's rock anchor crane beam for the Jingping Secondary Hydropower Station,optimization of drilling and blasting parameters as well as the charging constitution was carried out through extensive comparative tests with different schemes and blasting vibration monitoring.The results indicate that the blasting effect of 30 cm hole spacing is better than that of 40 cm hole spacing.Furthermore,the coupling coefficient of 30 cm hole spacing is also greater than that of 40 cm hole spacing.Therefore,an increased coupling coefficient could lead to a smoother rock surface and less damage induced by the blasting vibration.

Key concepts: Rock blasting, Drilling and blasting, Excavation, Hydropower, Geotechnical engineering, Beam (structure), Engineering, Drilling

Related papers

Back to paper searchBrowse research topicsOriginal source
Blasting test of underground workshop's rock anchor crane beam for Jinping Secondary Hydropower Station — Research Paper | ScholarLens