2008BlastingRequires access

Experimental Study on Rock Bench Blasting Excavation in Underground Workshop of Xiluodu Hydropower Station

Chen Jun-hua

Open publisher page 0 citations

Abstract

The rock bench excavation of rock-bolt crane beam is the key and difficult step in the construction of underground workshop of Xiluodu Hydropower Station.The technology requirements and the quality controls are rigid for boring and blasting.For desired blasting effects,different blasting parameters are adopted in the experiments of vertical holes and acclivitous holes smooth blasting in integrated and broken zones.A set of optimized construction procedure and blasting parameters are set down by comparison of different experiments and analysis of blasting vibration monitoring and broken rock zone tests.

About this research paper

What this paper is about

The rock bench excavation of rock-bolt crane beam is the key and difficult step in the construction of underground workshop of Xiluodu Hydropower Station.The technology requirements and the quality controls are rigid for boring and blasting.For desired blasting effects,different blasting parameters are adopted in the experiments of vertical holes and acclivitous holes smooth blasting in integrated and broken zones.A set of optimized construction procedure and blasting parameters are set down by comparison of different experiments and analysis of blasting vibration monitoring and broken rock zone tests.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The rock bench excavation of rock-bolt crane beam is the key and difficult step in the construction of underground workshop of Xiluodu Hydropower Station.The technology requirements and the quality controls are rigid for boring and blasting.For desired blasting effects,different blasting parameters are adopted in the experiments of vertical holes and acclivitous holes smooth blasting in integrated and broken zones.A set of optimized construction procedure and blasting parameters are set down by comparison of different experiments and analysis of blasting vibration monitoring and broken rock zone tests.

Key concepts: Rock blasting, Excavation, Hydropower, Geotechnical engineering, Mining engineering, Geology, Engineering, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Experimental Study on Rock Bench Blasting Excavation in Underground Workshop of Xiluodu Hydropower Station — Research Paper | ScholarLens