Blasting Excavation Technology of Underground Workshop′s Rock Anchor Crane Beam under Complex Conditions
Yu Liang
Abstract
Yu Liang
Abstract
In the blasting excavation of underground workshop′s rock anchor crane beam for Jinping secondary hydropower station,blasting parameters were optimized through repeating blasting excavation test according to the characteristics of poor geological condition and abundant fissure.Moreover,protective layer was reserved,drilling accuracy was controlled and charging constitution was optimized in the blasting construction.The quality of rock bench forming has been acquired.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the blasting excavation of underground workshop′s rock anchor crane beam for Jinping secondary hydropower station,blasting parameters were optimized through repeating blasting excavation test according to the characteristics of poor geological condition and abundant fissure.Moreover,protective layer was reserved,drilling accuracy was controlled and charging constitution was optimized in the blasting construction.The quality of rock bench forming has been acquired.
Key concepts: Excavation, Rock blasting, Drilling and blasting, Drilling, Geotechnical engineering, Mining engineering, Geology, Hydropower