2012•Guangzhou ArchitectureRequires access

Analysis on Key Technologies of Sinking Tunnel Construction Across the Existing Subway

HE Jun-qiao

Open publisher page 0 citations

Abstract

When the sinking tunnel across subway and city pipeline,the deformation control of existing structures is a technical problem. Based on the Huacheng Avenue tunnel of the systems engineering project of the Liede Bridge in Guangzhou City, this article analyze that the difficulty and treatment program of the tunnel construction especially the monitoring of the subway tunnel. The research results can provide important technical support for the safety of operation of existing subways and underground municipal pipelines, which can protect the construction of sinking tunnels or other relevant constructions as well.

About this research paper

What this paper is about

When the sinking tunnel across subway and city pipeline,the deformation control of existing structures is a technical problem. Based on the Huacheng Avenue tunnel of the systems engineering project of the Liede Bridge in Guangzhou City, this article analyze that the difficulty and treatment program of the tunnel construction especially the monitoring of the subway tunnel. The research results can provide important technical support for the safety of operation of existing subways and underground municipal pipelines, which can protect the construction of sinking tunnels or other relevant constructions as well.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

When the sinking tunnel across subway and city pipeline,the deformation control of existing structures is a technical problem. Based on the Huacheng Avenue tunnel of the systems engineering project of the Liede Bridge in Guangzhou City, this article analyze that the difficulty and treatment program of the tunnel construction especially the monitoring of the subway tunnel. The research results can provide important technical support for the safety of operation of existing subways and underground municipal pipelines, which can protect the construction of sinking tunnels or other relevant constructions as well.

Key concepts: Bridge (graph theory), Civil engineering, Pipeline transport, Tunnel construction, Engineering, Pipeline (software), Key (lock), Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis on Key Technologies of Sinking Tunnel Construction Across the Existing Subway — Research Paper | ScholarLens