The underground cut station tunnel construction technology of existing transportation subway
WU Fa-zha
Abstract
WU Fa-zha
Abstract
The engineering situation and difficult of underground cut tunnel subway No.1 line were introduced,the main measures adopted in underground cut station subway without subway No.1 line reinforcement protection were illustrated,including portal treatment,tunnel construction and terminal reinforcement,timely monitoring measurement therefore guaranteed subway No.1 line running safety.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The engineering situation and difficult of underground cut tunnel subway No.1 line were introduced,the main measures adopted in underground cut station subway without subway No.1 line reinforcement protection were illustrated,including portal treatment,tunnel construction and terminal reinforcement,timely monitoring measurement therefore guaranteed subway No.1 line running safety.
Key concepts: Subway station, Engineering, Line (geometry), Tunnel construction, Civil engineering, Transport engineering, Geotechnical engineering, Mathematics