Project performance analysis based on weight earned value method by simulation
Mao Jing-ying
Abstract
Mao Jing-ying
Abstract
Traditional earned value method was a deterministic method,it was not in accordance with uncertainty of large-scale engineering projects.It also conducted performance evaluation from the perspective of overall project.It didn't distinguish different effects from critical activities and non-critical activities.To solve these problems,based on S curves method,a new approach of weight earned value was put forward according to the different weight given by critical level of activties.Performance monitoring was carried out by integrating project performance and critical path performance.According to the performance monitoring result,the cost and time parameters of the activities which were in progress or not started yet were adjusted.Simulation method was used to predict future project performance,the Cost Variation at Completion(CVAC) and the Schedule Variation at Completion(SVAC) were obtained and the forecast of project performance was realized.A case study of a 3-story housing project was provided to demonstrate the application of the proposed method in project management.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Traditional earned value method was a deterministic method,it was not in accordance with uncertainty of large-scale engineering projects.It also conducted performance evaluation from the perspective of overall project.It didn't distinguish different effects from critical activities and non-critical activities.To solve these problems,based on S curves method,a new approach of weight earned value was put forward according to the different weight given by critical level of activties.Performance monitoring was carried out by integrating project performance and critical path performance.According to the performance monitoring result,the cost and time parameters of the activities which were in progress or not started yet were adjusted.Simulation method was used to predict future project performance,the Cost Variation at Completion(CVAC) and the Schedule Variation at Completion(SVAC) were obtained and the forecast of project performance was realized.A case study of a 3-story housing project was provided to demonstrate the application of the proposed method in project management.
Key concepts: Earned value management, Critical path method, Schedule, Project management, Computer science, Operations research, Perspective (graphical), Industrial engineering