Continuous Project Evaluation of An Infrastructure Using Earned Value Analysis

Rajhans S. Mathpati, Dr.A.S. Wayal

Open full text 0 citations

Abstract

Project is a temporary endeavor undertaken to give unique output or product and infrastructure is a physical structure needed for the operations of society.These infrastructure projects have different complexities and uncertainties, hence the continuous project performance evaluation becomes necessity for project.Scope, Schedule and Budget: these are the major potential measures in order to evaluate the performance of project.Earned value analysis can be used as a project performance evaluator for infrastructure project.Earned value analysis integrates cost, schedule and work performance to estimate the status of project.This is the technique which gives the quantitative measure of a project performance.In Earned value analysis comparison between planned baseline and actual progress of work is conducted.Study includes the continuous evaluation of PQC road project during 1st October 2014 to 15 th March 2015.Work break down structure is prepared such that single work package is obtained and accordingly scheduling is done using MS-Project 2013.By comparing progress of actual work to baseline values of Cost variance, schedule variance, Critical ratio, Cost performance index, schedule performance index are calculated and continuous evaluation is carried out.

Open-access reader

About this research paper

What this paper is about

Project is a temporary endeavor undertaken to give unique output or product and infrastructure is a physical structure needed for the operations of society.These infrastructure projects have different complexities and uncertainties, hence the continuous project performance evaluation becomes necessity for project.Scope, Schedule and Budget: these are the major potential measures in order to evaluate the performance of project.Earned value analysis can be used as a project performance evaluator for infrastructure project.Earned value analysis integrates cost, schedule and work performance to estimate the status of project.This is the technique which gives the quantitative measure of a project performance.In Earned value analysis comparison between planned baseline and actual progress of work is conducted.Study includes the continuous evaluation of PQC road project during 1st October 2014 to 15 th March 2015.Work break down structure is prepared such that single work package is obtained and accordingly scheduling is done using MS-Project 2013.By comparing progress of actual work to baseline values of Cost variance, schedule variance, Critical ratio, Cost performance index, schedule performance index are calculated and continuous evaluation is carried out.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Project is a temporary endeavor undertaken to give unique output or product and infrastructure is a physical structure needed for the operations of society.These infrastructure projects have different complexities and uncertainties, hence the continuous project performance evaluation becomes necessity for project.Scope, Schedule and Budget: these are the major potential measures in order to evaluate the performance of project.Earned value analysis can be used as a project performance evaluator for infrastructure project.Earned value analysis integrates cost, schedule and work performance to estimate the status of project.This is the technique which gives the quantitative measure of a project performance.In Earned value analysis comparison between planned baseline and actual progress of work is conducted.Study includes the continuous evaluation of PQC road project during 1st October 2014 to 15 th March 2015.Work break down structure is prepared such that single work package is obtained and accordingly scheduling is done using MS-Project 2013.By comparing progress of actual work to baseline values of Cost variance, schedule variance, Critical ratio, Cost performance index, schedule performance index are calculated and continuous evaluation is carried out.

Key concepts: Earned value management, Value (mathematics), Computer science, Engineering management, Engineering, Systems engineering, Project management, Project planning

Related papers

Back to paper searchBrowse research topicsOriginal source
Continuous Project Evaluation of An Infrastructure Using Earned Value Analysis — Research Paper | ScholarLens