2002Journal of Yangtze River Scientific Research InstituteRequires access

Hydraulics test research on diversion sluicefor extension project of Taocha Canal Headwork

Huang Guo

Open publisher page 0 citations

Abstract

The extension project of Taocha Canal Headwork will be the water sources project of the Middel Line of Diversion Project from South to North China. The practical mode of opertion of the old works and, emphatically, the hydraulics test results of late extension project of the sluice, i.e.,the heightened scheme of rockfill dam, are represented,including discharge capacity,the discrimination and analyisis of flow patterns in the culvert, the conjuction of flow downstrearn and the pressure properties on the side wall of structures. Some modifications recommendations for the design and some concrete measures for improving hydraulic characteristics in culvert by reasonable gate operation are proposed.

About this research paper

What this paper is about

The extension project of Taocha Canal Headwork will be the water sources project of the Middel Line of Diversion Project from South to North China. The practical mode of opertion of the old works and, emphatically, the hydraulics test results of late extension project of the sluice, i.e.,the heightened scheme of rockfill dam, are represented,including discharge capacity,the discrimination and analyisis of flow patterns in the culvert, the conjuction of flow downstrearn and the pressure properties on the side wall of structures. Some modifications recommendations for the design and some concrete measures for improving hydraulic characteristics in culvert by reasonable gate operation are proposed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The extension project of Taocha Canal Headwork will be the water sources project of the Middel Line of Diversion Project from South to North China. The practical mode of opertion of the old works and, emphatically, the hydraulics test results of late extension project of the sluice, i.e.,the heightened scheme of rockfill dam, are represented,including discharge capacity,the discrimination and analyisis of flow patterns in the culvert, the conjuction of flow downstrearn and the pressure properties on the side wall of structures. Some modifications recommendations for the design and some concrete measures for improving hydraulic characteristics in culvert by reasonable gate operation are proposed.

Key concepts: Culvert, Sluice, Hydraulics, Geotechnical engineering, Engineering, Extension (predicate logic), Civil engineering, Hydraulic structure

Related papers

Back to paper searchBrowse research topicsOriginal source
Hydraulics test research on diversion sluicefor extension project of Taocha Canal Headwork — Research Paper | ScholarLens