2010Yangtze RiverRequires access

Research on design of Taocha hydro-junction project at canal head of Phase I Works of Middle Route Project of S-N Water Diversion

Deng Ying

Open publisher page 0 citations

Abstract

Taocha hydro-junction project is the diversion canal head of Middle Route Project of S-N Water Diversion and also the secondary dam of Danjiangkou Reservoir,and its functions are water retaining,water diversion,power generation by using diversion discharge and water head difference of the sluice.Through comprehensive consideration on the sluice function,sluice building condition,old sluice utilization,operation mode etc.and tech-economical comparison,the scheme of re-building the hydro-junction 70m downstream the original one is adopted.In the scheme,a tubular hydropower station is to be constructed on left bank and water diversion sluice on the right of the main canal.In the light of foundation rock integrity and permeability,the seepage control measures for dam foundation and mountain bodies on the bank are adopted.

About this research paper

What this paper is about

Taocha hydro-junction project is the diversion canal head of Middle Route Project of S-N Water Diversion and also the secondary dam of Danjiangkou Reservoir,and its functions are water retaining,water diversion,power generation by using diversion discharge and water head difference of the sluice.Through comprehensive consideration on the sluice function,sluice building condition,old sluice utilization,operation mode etc.and tech-economical comparison,the scheme of re-building the hydro-junction 70m downstream the original one is adopted.In the scheme,a tubular hydropower station is to be constructed on left bank and water diversion sluice on the right of the main canal.In the light of foundation rock integrity and permeability,the seepage control measures for dam foundation and mountain bodies on the bank are adopted.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taocha hydro-junction project is the diversion canal head of Middle Route Project of S-N Water Diversion and also the secondary dam of Danjiangkou Reservoir,and its functions are water retaining,water diversion,power generation by using diversion discharge and water head difference of the sluice.Through comprehensive consideration on the sluice function,sluice building condition,old sluice utilization,operation mode etc.and tech-economical comparison,the scheme of re-building the hydro-junction 70m downstream the original one is adopted.In the scheme,a tubular hydropower station is to be constructed on left bank and water diversion sluice on the right of the main canal.In the light of foundation rock integrity and permeability,the seepage control measures for dam foundation and mountain bodies on the bank are adopted.

Key concepts: Sluice, Water diversion, Hydropower, Head (geology), Foundation (evidence), Hydraulic head, Engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on design of Taocha hydro-junction project at canal head of Phase I Works of Middle Route Project of S-N Water Diversion — Research Paper | ScholarLens