Diversion of Goupitan Hydropower Station was divided into three diversion periods in design.In the preliminary engineering period,adopted diversion scheme is the method of diversion around year that damming up is by RCC cofferdams and discharging is by diversion tunnels.And in middle and later periods,the scheme is method of diversion around year that damming up is temporarily by dam body,and discharging is by combining diversion tunnels,spilling tunnel,and diversion bottom orifices,empty orifices,spilling middle and up orifices on the dam body.The preliminary diversion standard is adopted ten-year cycle flood in design,the corresponding flow is 13,500 m~3/s.There are two diversion tunnels on the left bank,floor elevations of the inlets are 430 m and 450 m respectively,and one on the right bank,floor elevation is 430 m.The grade of the diversion structures is Ⅳ.

About this research paper

What this paper is about

Diversion of Goupitan Hydropower Station was divided into three diversion periods in design.In the preliminary engineering period,adopted diversion scheme is the method of diversion around year that damming up is by RCC cofferdams and discharging is by diversion tunnels.And in middle and later periods,the scheme is method of diversion around year that damming up is temporarily by dam body,and discharging is by combining diversion tunnels,spilling tunnel,and diversion bottom orifices,empty orifices,spilling middle and up orifices on the dam body.The preliminary diversion standard is adopted ten-year cycle flood in design,the corresponding flow is 13,500 m~3/s.There are two diversion tunnels on the left bank,floor elevations of the inlets are 430 m and 450 m respectively,and one on the right bank,floor elevation is 430 m.The grade of the diversion structures is Ⅳ.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Diversion of Goupitan Hydropower Station was divided into three diversion periods in design.In the preliminary engineering period,adopted diversion scheme is the method of diversion around year that damming up is by RCC cofferdams and discharging is by diversion tunnels.And in middle and later periods,the scheme is method of diversion around year that damming up is temporarily by dam body,and discharging is by combining diversion tunnels,spilling tunnel,and diversion bottom orifices,empty orifices,spilling middle and up orifices on the dam body.The preliminary diversion standard is adopted ten-year cycle flood in design,the corresponding flow is 13,500 m~3/s.There are two diversion tunnels on the left bank,floor elevations of the inlets are 430 m and 450 m respectively,and one on the right bank,floor elevation is 430 m.The grade of the diversion structures is Ⅳ.

Key concepts: Cofferdam, Water diversion, Hydropower, Body orifice, Flood myth, Engineering, Hydrology (agriculture), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Design of Diversion for Goupitan Hydropower Station — Research Paper | ScholarLens