Planning and Implementation of Construction Diversion for Longkaikou Hydropower Station

Wang Zhexin

Open publisher page 0 citations

Abstract

A stage diversion scheme is selected with flood discharged through diversion channel at the left bank in Longkaikou Hydropower Station.In Stage I,the diversion channel is constructed with the flood discharged through contracted river channel.In Stage II,the dam and right-bank powerhouse are constructed with the flood discharged through diversion channel.In Stage III,the dam gap above diversion bottom outlet in dam's diversion channel section and other unfinished dam section are constructed while the flood is blocked by completed dam section and discharged by diversion bottom outlet.The joint application of bottom outlet and dam gap diversion in Stage III accelerates the construction progress of dam's diversion channel section,shortens the construction period before the commissioning of first hydro-generator and obtains good economic benefits.

About this research paper

What this paper is about

A stage diversion scheme is selected with flood discharged through diversion channel at the left bank in Longkaikou Hydropower Station.In Stage I,the diversion channel is constructed with the flood discharged through contracted river channel.In Stage II,the dam and right-bank powerhouse are constructed with the flood discharged through diversion channel.In Stage III,the dam gap above diversion bottom outlet in dam's diversion channel section and other unfinished dam section are constructed while the flood is blocked by completed dam section and discharged by diversion bottom outlet.The joint application of bottom outlet and dam gap diversion in Stage III accelerates the construction progress of dam's diversion channel section,shortens the construction period before the commissioning of first hydro-generator and obtains good economic benefits.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A stage diversion scheme is selected with flood discharged through diversion channel at the left bank in Longkaikou Hydropower Station.In Stage I,the diversion channel is constructed with the flood discharged through contracted river channel.In Stage II,the dam and right-bank powerhouse are constructed with the flood discharged through diversion channel.In Stage III,the dam gap above diversion bottom outlet in dam's diversion channel section and other unfinished dam section are constructed while the flood is blocked by completed dam section and discharged by diversion bottom outlet.The joint application of bottom outlet and dam gap diversion in Stage III accelerates the construction progress of dam's diversion channel section,shortens the construction period before the commissioning of first hydro-generator and obtains good economic benefits.

Key concepts: Hydropower, Water diversion, Flood myth, Channel (broadcasting), Stage (stratigraphy), Section (typography), Joint (building), Flood prevention

Related papers

Back to paper searchBrowse research topicsOriginal source
Planning and Implementation of Construction Diversion for Longkaikou Hydropower Station — Research Paper | ScholarLens