Diversion design and construction of Longtan Hydropower Station

Yi Song

Open publisher page 0 citations

Abstract

The construction diversion of Longtan Hydropower Station is large in diversion tunnel scale, complicated in operation conditions, and high in cofferdam Its diversion tunnel is the largest section pressured tunnel in the built and under build projects at home at present, with the highest water head during its blockage period The maximum height of the cofferdam is 82 7 m The tunnel diversion is divided into three periods of first stage diversion, provisional flood retaining during construction period and initial power generation When the river is closed, the diversion design flood standard is 20 year flood and the cofferdam water retaining standard is 10 year flood The diversion tunnel is excavated by three layers with the height of about 8~10 meters each The right and left diversion tunnels were checked and accepted The river closure can be carried out on schedule

About this research paper

What this paper is about

The construction diversion of Longtan Hydropower Station is large in diversion tunnel scale, complicated in operation conditions, and high in cofferdam Its diversion tunnel is the largest section pressured tunnel in the built and under build projects at home at present, with the highest water head during its blockage period The maximum height of the cofferdam is 82 7 m The tunnel diversion is divided into three periods of first stage diversion, provisional flood retaining during construction period and initial power generation When the river is closed, the diversion design flood standard is 20 year flood and the cofferdam water retaining standard is 10 year flood The diversion tunnel is excavated by three layers with the height of about 8~10 meters each The right and left diversion tunnels were checked and accepted The river closure can be carried out on schedule

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction diversion of Longtan Hydropower Station is large in diversion tunnel scale, complicated in operation conditions, and high in cofferdam Its diversion tunnel is the largest section pressured tunnel in the built and under build projects at home at present, with the highest water head during its blockage period The maximum height of the cofferdam is 82 7 m The tunnel diversion is divided into three periods of first stage diversion, provisional flood retaining during construction period and initial power generation When the river is closed, the diversion design flood standard is 20 year flood and the cofferdam water retaining standard is 10 year flood The diversion tunnel is excavated by three layers with the height of about 8~10 meters each The right and left diversion tunnels were checked and accepted The river closure can be carried out on schedule

Key concepts: Cofferdam, Hydropower, Water diversion, Flood myth, Hydroelectricity, Hydrology (agriculture), Hydro power, Stage (stratigraphy)