2010Tunnel ConstructionRequires access

Study on Ventilation of Extra-long Tunnel on West Line of South-to-north Water Transfer Project Constructed by TBM

Yun Li

Open publisher page 0 citations

Abstract

In order to meet the requirements of the airflow and heat transfer at the working faces of extra-long tunnels on plateaus constructed by TBM,full study is made on the ventilation methods and ventilation equipment matching during the construction of these tunnels.With the help of many kinds of parameters,the author in the study confirms the ventilation method and calculates in detail the required airflow.After the study on the matching between the ventilation fans and the ventilation ducts by means of numerical simulation,a match of ventilation fans and ventilation ducts that can meet the ventilation requirements of the tunnel is proposed.The author also studies the air velocity distribution and thermal environment rules in the tunnel by means of numerical simulation,which offers a scientific and intuitive estimate on the environment during the tunnel construction.

About this research paper

What this paper is about

In order to meet the requirements of the airflow and heat transfer at the working faces of extra-long tunnels on plateaus constructed by TBM,full study is made on the ventilation methods and ventilation equipment matching during the construction of these tunnels.With the help of many kinds of parameters,the author in the study confirms the ventilation method and calculates in detail the required airflow.After the study on the matching between the ventilation fans and the ventilation ducts by means of numerical simulation,a match of ventilation fans and ventilation ducts that can meet the ventilation requirements of the tunnel is proposed.The author also studies the air velocity distribution and thermal environment rules in the tunnel by means of numerical simulation,which offers a scientific and intuitive estimate on the environment during the tunnel construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to meet the requirements of the airflow and heat transfer at the working faces of extra-long tunnels on plateaus constructed by TBM,full study is made on the ventilation methods and ventilation equipment matching during the construction of these tunnels.With the help of many kinds of parameters,the author in the study confirms the ventilation method and calculates in detail the required airflow.After the study on the matching between the ventilation fans and the ventilation ducts by means of numerical simulation,a match of ventilation fans and ventilation ducts that can meet the ventilation requirements of the tunnel is proposed.The author also studies the air velocity distribution and thermal environment rules in the tunnel by means of numerical simulation,which offers a scientific and intuitive estimate on the environment during the tunnel construction.

Key concepts: Ventilation (architecture), Airflow, Engineering, Marine engineering, Line (geometry), Computer simulation, Heat transfer, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Ventilation of Extra-long Tunnel on West Line of South-to-north Water Transfer Project Constructed by TBM — Research Paper | ScholarLens