2010Yangtze RiverRequires access

Suggestions for planning and construction of flood detention basin in Yangtze River Basin after operation of Three Gorge Project

Xiaohong Zhang

Open publisher page 0 citations

Abstract

The Flood of the Yangtze River is characterized by large flood volume with high peak and long duration,and making full use of flood detention basins is one of the important measures to ensure the flood safety of key regions.The function of flood detention basin in the Yangtze River basin after the operation of TGP is analyzed.It is suggested that dynamic research on extra flood volume of the Yangtze River should be conducted according to the flood control situation;the flood detention basins in the Yangtze River Basin should be planned reasonably according to new situation after the operation of TGP,and both classified and constructed according to their operation frequency,flood diversion effect and importance.

About this research paper

What this paper is about

The Flood of the Yangtze River is characterized by large flood volume with high peak and long duration,and making full use of flood detention basins is one of the important measures to ensure the flood safety of key regions.The function of flood detention basin in the Yangtze River basin after the operation of TGP is analyzed.It is suggested that dynamic research on extra flood volume of the Yangtze River should be conducted according to the flood control situation;the flood detention basins in the Yangtze River Basin should be planned reasonably according to new situation after the operation of TGP,and both classified and constructed according to their operation frequency,flood diversion effect and importance.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Flood of the Yangtze River is characterized by large flood volume with high peak and long duration,and making full use of flood detention basins is one of the important measures to ensure the flood safety of key regions.The function of flood detention basin in the Yangtze River basin after the operation of TGP is analyzed.It is suggested that dynamic research on extra flood volume of the Yangtze River should be conducted according to the flood control situation;the flood detention basins in the Yangtze River Basin should be planned reasonably according to new situation after the operation of TGP,and both classified and constructed according to their operation frequency,flood diversion effect and importance.

Key concepts: Flood myth, Detention basin, Flood control, Structural basin, Hydrology (agriculture), Yangtze river, Drainage basin, 100-year flood

Related papers

Back to paper searchBrowse research topicsOriginal source
Suggestions for planning and construction of flood detention basin in Yangtze River Basin after operation of Three Gorge Project — Research Paper | ScholarLens