Quarrying blasting of rock-fill dam with concrete facing of Hongjiadu Hydroelectric Station
Guisong Zhou, Gzb Explosives
Abstract
Guisong Zhou, Gzb Explosives
Abstract
In this paper, the design of excavating rock material of rock-fill dam with concrete facing of Hongjiadu Hydroelectric Station is described in detail and the blasting parameters are presented. A lump prediction model is established by test data. It is used as reference to similar engineering.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this paper, the design of excavating rock material of rock-fill dam with concrete facing of Hongjiadu Hydroelectric Station is described in detail and the blasting parameters are presented. A lump prediction model is established by test data. It is used as reference to similar engineering.
Key concepts: Hydroelectricity, Plucking, Rock blasting, Geotechnical engineering, Geology, Mining engineering, Engineering, Civil engineering