Plan to Treat Seepage Problem in the Left Dam Abutment of Huihe Reservoir
WU Xue-qi
Abstract
WU Xue-qi
Abstract
After the construction of Huihe Reservoir had been finished and the water had been stored in the reservoir,the seepage phenomenon in the left dam abutment have occured many times.In the design of danger-removing and consolidating reservoir,the high pressure jet grouting anti-seepage wall as the treatment plan is adopted.In this paper the design parameters of design are determined resonably.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
After the construction of Huihe Reservoir had been finished and the water had been stored in the reservoir,the seepage phenomenon in the left dam abutment have occured many times.In the design of danger-removing and consolidating reservoir,the high pressure jet grouting anti-seepage wall as the treatment plan is adopted.In this paper the design parameters of design are determined resonably.
Key concepts: Abutment, Water pressure, Geotechnical engineering, Plan (archaeology), Geology, Engineering, Civil engineering, Paleontology