Analysis of Seepage and Measures of Seepage Control Strengthening for Right Abutment of Shitouhe Reservoir Dam.
Peng Dong
Abstract
Peng Dong
Abstract
Shitouhe Reservoir is a large(Ⅱ) hydrocomplex project built in the 1970s. The seepage flows at several places in its right abutment were found out in 1988. Then the causes of seepage was checked throuth geologic prospecting, and the measures for seepage control strengthening have been made, the effect of which is well.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Shitouhe Reservoir is a large(Ⅱ) hydrocomplex project built in the 1970s. The seepage flows at several places in its right abutment were found out in 1988. Then the causes of seepage was checked throuth geologic prospecting, and the measures for seepage control strengthening have been made, the effect of which is well.
Key concepts: Abutment, Geotechnical engineering, Prospecting, Geology, Engineering, Mining engineering, Civil engineering