Treatment for Seepage Control of Right Dam Abutment of Wangjiaya Reservoir
Wenhua Liu
Abstract
Wenhua Liu
Abstract
The leakage of right dam abutment of Wangjiaya reservoir is one of big problems left behind the project construction.Although various measures of seepage control were used,there was no obvious effect after the project had been completed.In August,1974,the scheme of plain soil backfull of concrete open caisson for seepage control was used,with good result.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The leakage of right dam abutment of Wangjiaya reservoir is one of big problems left behind the project construction.Although various measures of seepage control were used,there was no obvious effect after the project had been completed.In August,1974,the scheme of plain soil backfull of concrete open caisson for seepage control was used,with good result.
Key concepts: Abutment, Caisson, Geotechnical engineering, Geology, Engineering, Civil engineering