Study on Lime Improved Expansive Soil Filling in Hefei-Nanjing Passenger Dedicated Line
XU Dun-mei
Abstract
XU Dun-mei
Abstract
In order to solve the problem that moderate weak expansive oil along Hefei-Nanjing Passenger Dedicated Line cannot be directly used as subgrade filling for expansion in water and shrinkage out of water,this paper studies the construction technology for expansive soil filled subgrade combined with Hefei-Nanjing Passenger Dedicated Line engineering.It is indicated from post-construction settlement analysis that the construction technology with lime improved expansive soil as subgrade filling can satisfy each index and requirement of the subgrade of passenger dedicated line.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In order to solve the problem that moderate weak expansive oil along Hefei-Nanjing Passenger Dedicated Line cannot be directly used as subgrade filling for expansion in water and shrinkage out of water,this paper studies the construction technology for expansive soil filled subgrade combined with Hefei-Nanjing Passenger Dedicated Line engineering.It is indicated from post-construction settlement analysis that the construction technology with lime improved expansive soil as subgrade filling can satisfy each index and requirement of the subgrade of passenger dedicated line.
Key concepts: Subgrade, Expansive clay, Lime, Expansive, Geotechnical engineering, Settlement (finance), Dedicated line, Shrinkage