Discussion on Start up Mode of 300MW Trurbine Generator Unit Without Motor Feedwater Pump
MA Hossain
Abstract
MA Hossain
Abstract
The advantages and shortcomings of 300MW unit mormal start-up are analyzed in Fengcheng power plant. The new shat-up mode that turbo-feed water pump instead motor-driven feedwater pump is put forward. The operation and notices are described and for small turbine high-pressure steam source with anxiliarg steam system is discussed.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The advantages and shortcomings of 300MW unit mormal start-up are analyzed in Fengcheng power plant. The new shat-up mode that turbo-feed water pump instead motor-driven feedwater pump is put forward. The operation and notices are described and for small turbine high-pressure steam source with anxiliarg steam system is discussed.
Key concepts: Boiler feedwater, Boiler feedwater pump, Feedwater heater, Boiler (water heating), Steam turbine, Engineering, Turbine, Turbo generator