2012Journal of Lanzhou Jiaotong UniversityRequires access

Experimental Research on Bearing Capacity of Cast-in-place for Large-diameter and Rock-socketed Bridge Pile with Self-balanced Method

Xu Wang

Open publisher page 0 citations

Abstract

According to the project of No.1 bridge in Tianshui economic clevelopment zone,the bearing capacity test for 3 bored piles(diameter is 1.2 m,length is 35 m,47 m and 35 m,respectively) is carried out by using self-balanced method.On the basis of collecting and analyzing the test data,the bearing behavior of foundation pile and pile side resistance features are studied to obtain the necessary technical data,verify the design parameter and provide reliable parameters for pile design of the similar project in this area.The result indicates that the self-balanced method is an effective and simplified testing method in pile foundation static test,and it has attained excellent engineering effect and can be used widely in the similar project.

About this research paper

What this paper is about

According to the project of No.1 bridge in Tianshui economic clevelopment zone,the bearing capacity test for 3 bored piles(diameter is 1.2 m,length is 35 m,47 m and 35 m,respectively) is carried out by using self-balanced method.On the basis of collecting and analyzing the test data,the bearing behavior of foundation pile and pile side resistance features are studied to obtain the necessary technical data,verify the design parameter and provide reliable parameters for pile design of the similar project in this area.The result indicates that the self-balanced method is an effective and simplified testing method in pile foundation static test,and it has attained excellent engineering effect and can be used widely in the similar project.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to the project of No.1 bridge in Tianshui economic clevelopment zone,the bearing capacity test for 3 bored piles(diameter is 1.2 m,length is 35 m,47 m and 35 m,respectively) is carried out by using self-balanced method.On the basis of collecting and analyzing the test data,the bearing behavior of foundation pile and pile side resistance features are studied to obtain the necessary technical data,verify the design parameter and provide reliable parameters for pile design of the similar project in this area.The result indicates that the self-balanced method is an effective and simplified testing method in pile foundation static test,and it has attained excellent engineering effect and can be used widely in the similar project.

Key concepts: Pile, Foundation (evidence), Bridge (graph theory), Bearing capacity, Bearing (navigation), Structural engineering, Geotechnical engineering, Load testing

Related papers

Back to paper searchBrowse research topicsOriginal source