Technology of Three-arch Structure Subway Tunnel Construction in Sand and Gravel

Crec Electrification

Open publisher page 0 citations

Abstract

The three-arch structure in shallow underground excavation of subway stations has been adopted more and more common.Most of the mining structure using safe,good flexibility,easy to operate,the low level of mechanization,unearthed efficient process with less interference in the construction technology hole.The three-arch tunnel on Shiliuzhuang Subway Sation of Line 4 in Beijing Metro passes through the ground consisting of silty clay and medium-coarse sand,which is constructed by means of the center drift method.The central drift of the tunnel is excavated first,which is followed by the excavation of the side drifts.The conversion of the force-bearing of the tunnel during construction is very complex and the settlement occurring in different excavation steps has great impaction the settlement of ground.By means of adopting proper construction methods and modifying the reinforcement parameters on the basis of the monitoring data,the safety and stability of the tunnel are guaranteed and the difficult problems are solved.

About this research paper

What this paper is about

The three-arch structure in shallow underground excavation of subway stations has been adopted more and more common.Most of the mining structure using safe,good flexibility,easy to operate,the low level of mechanization,unearthed efficient process with less interference in the construction technology hole.The three-arch tunnel on Shiliuzhuang Subway Sation of Line 4 in Beijing Metro passes through the ground consisting of silty clay and medium-coarse sand,which is constructed by means of the center drift method.The central drift of the tunnel is excavated first,which is followed by the excavation of the side drifts.The conversion of the force-bearing of the tunnel during construction is very complex and the settlement occurring in different excavation steps has great impaction the settlement of ground.By means of adopting proper construction methods and modifying the reinforcement parameters on the basis of the monitoring data,the safety and stability of the tunnel are guaranteed and the difficult problems are solved.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The three-arch structure in shallow underground excavation of subway stations has been adopted more and more common.Most of the mining structure using safe,good flexibility,easy to operate,the low level of mechanization,unearthed efficient process with less interference in the construction technology hole.The three-arch tunnel on Shiliuzhuang Subway Sation of Line 4 in Beijing Metro passes through the ground consisting of silty clay and medium-coarse sand,which is constructed by means of the center drift method.The central drift of the tunnel is excavated first,which is followed by the excavation of the side drifts.The conversion of the force-bearing of the tunnel during construction is very complex and the settlement occurring in different excavation steps has great impaction the settlement of ground.By means of adopting proper construction methods and modifying the reinforcement parameters on the basis of the monitoring data,the safety and stability of the tunnel are guaranteed and the difficult problems are solved.

Key concepts: Excavation, Arch, Engineering, Settlement (finance), Geotechnical engineering, Civil engineering, Computer science, Payment

Related papers

Back to paper searchBrowse research topicsOriginal source
Technology of Three-arch Structure Subway Tunnel Construction in Sand and Gravel — Research Paper | ScholarLens