Technical Difficulties and Measures in the Construction of Subway Station Due to Shield Machine's Crossing Station
Erping Wang
Abstract
Erping Wang
Abstract
Based on the analysis of the shield machine's crossing Yuanmingyuan station on metro line No.4 in Beijing, this paper discusses mainly the adjustment of the shield axis, the change of support structure and the reinforcement of the ends of station. And, the technical difficulties in the construction of subway station are researched because the shield machine crosses the station before the station begins to construct. At last, the technical measures are presented in this paper.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the analysis of the shield machine's crossing Yuanmingyuan station on metro line No.4 in Beijing, this paper discusses mainly the adjustment of the shield axis, the change of support structure and the reinforcement of the ends of station. And, the technical difficulties in the construction of subway station are researched because the shield machine crosses the station before the station begins to construct. At last, the technical measures are presented in this paper.
Key concepts: Shield, Subway station, Engineering, Metro station, Beijing, Civil engineering, Total station, Transport engineering