2013•Shanxi ArchitectureRequires access

The effect and treatment measures of shield advanced transit on metro station construction

Zhong Yu-gang

Open publisher page 0 citations

Abstract

Taking shield advanced after construction station of Old Summer Palace station of Beijing metro No.4 line as an example,this paper briefly elaborated the effect factors of station construction by shield forming tunnel,and the reinforcing treatment measures to ensure foundation pit stability,solve the problem of construction safe and foundation pit stability.

About this research paper

What this paper is about

Taking shield advanced after construction station of Old Summer Palace station of Beijing metro No.4 line as an example,this paper briefly elaborated the effect factors of station construction by shield forming tunnel,and the reinforcing treatment measures to ensure foundation pit stability,solve the problem of construction safe and foundation pit stability.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking shield advanced after construction station of Old Summer Palace station of Beijing metro No.4 line as an example,this paper briefly elaborated the effect factors of station construction by shield forming tunnel,and the reinforcing treatment measures to ensure foundation pit stability,solve the problem of construction safe and foundation pit stability.

Key concepts: Shield, Subway station, Foundation (evidence), Metro station, Beijing, Engineering, Civil engineering, Transit (satellite)

Related papers

Back to paper searchBrowse research topicsOriginal source
The effect and treatment measures of shield advanced transit on metro station construction — Research Paper | ScholarLens