The effect and treatment measures of shield advanced transit on metro station construction
Zhong Yu-gang
Abstract
Zhong Yu-gang
Abstract
Taking shield advanced after construction station of Old Summer Palace station of Beijing metro No.4 line as an example,this paper briefly elaborated the effect factors of station construction by shield forming tunnel,and the reinforcing treatment measures to ensure foundation pit stability,solve the problem of construction safe and foundation pit stability.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking shield advanced after construction station of Old Summer Palace station of Beijing metro No.4 line as an example,this paper briefly elaborated the effect factors of station construction by shield forming tunnel,and the reinforcing treatment measures to ensure foundation pit stability,solve the problem of construction safe and foundation pit stability.
Key concepts: Shield, Subway station, Foundation (evidence), Metro station, Beijing, Engineering, Civil engineering, Transit (satellite)