2009•Northern CommunicationsRequires access

Simple Talking about Schemes for Construction of Precasting the Small Box Girder of Prestressed Concrete

Wang Xiao-guan

Open publisher page 0 citations

Abstract

Superstructure of grade separation bridge on Shen-Kang freeway(the second phase of project) is a small box girder assembled and of prestressed concrete.The girder body is cast in post-tensioning method.The paper details schemes for precasting construction of small box girder.

About this research paper

What this paper is about

Superstructure of grade separation bridge on Shen-Kang freeway(the second phase of project) is a small box girder assembled and of prestressed concrete.The girder body is cast in post-tensioning method.The paper details schemes for precasting construction of small box girder.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Superstructure of grade separation bridge on Shen-Kang freeway(the second phase of project) is a small box girder assembled and of prestressed concrete.The girder body is cast in post-tensioning method.The paper details schemes for precasting construction of small box girder.

Key concepts: Box girder, Structural engineering, Prestressed concrete, Girder, Bridge (graph theory), Engineering, Superstructure, Simple (philosophy)

Related papers

Back to paper searchBrowse research topicsOriginal source
Simple Talking about Schemes for Construction of Precasting the Small Box Girder of Prestressed Concrete — Research Paper | ScholarLens