2003•Qiaoliang jiansheRequires access

Construction of 70-m Prestressed Concrete Box Girders with High-Level Precasting Bed Method

Yu Zheng

Open publisher page 0 citations

Abstract

The East China Sea Bridge is the first bridge having ever been built in China offsea where the construction environment is very harsh. The 70m box girder of the Bridge is 4 m in depth, bridge deck is 15.05 m in width and weight per girder is about 2 000 t, which will be assembled with segmental precast method. To minimize the usage of large lifting equipment in the precasting yard, the box girders will be precast on highlevel precasting bed. In this paper, the design considerations, layout of precasting bed, types of formwork for the box girders, and selection of launching equipment and schemes are described. 

About this research paper

What this paper is about

The East China Sea Bridge is the first bridge having ever been built in China offsea where the construction environment is very harsh. The 70m box girder of the Bridge is 4 m in depth, bridge deck is 15.05 m in width and weight per girder is about 2 000 t, which will be assembled with segmental precast method. To minimize the usage of large lifting equipment in the precasting yard, the box girders will be precast on highlevel precasting bed. In this paper, the design considerations, layout of precasting bed, types of formwork for the box girders, and selection of launching equipment and schemes are described. 

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The East China Sea Bridge is the first bridge having ever been built in China offsea where the construction environment is very harsh. The 70m box girder of the Bridge is 4 m in depth, bridge deck is 15.05 m in width and weight per girder is about 2 000 t, which will be assembled with segmental precast method. To minimize the usage of large lifting equipment in the precasting yard, the box girders will be precast on highlevel precasting bed. In this paper, the design considerations, layout of precasting bed, types of formwork for the box girders, and selection of launching equipment and schemes are described. 

Key concepts: Precast concrete, Box girder, Engineering, Girder, Deck, Structural engineering, Bridge (graph theory), Formwork