Precasting of Segmental Box Girder of Paksey Bridge
Dejun Liu
Abstract
Dejun Liu
Abstract
This paper systematically deals with the precasting technology for segmental box girder of Paksey Bridge with long-line match method. The construction technique features thereof are illustrated from aspects of casting bed setting-out, formwork design and casting sequences, and the quality control procedures are described from reinforcement installation, concreting, concrete curing, girder segments separation and lifting.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper systematically deals with the precasting technology for segmental box girder of Paksey Bridge with long-line match method. The construction technique features thereof are illustrated from aspects of casting bed setting-out, formwork design and casting sequences, and the quality control procedures are described from reinforcement installation, concreting, concrete curing, girder segments separation and lifting.
Key concepts: Formwork, Box girder, Engineering, Structural engineering, Girder, Casting, Bridge (graph theory), Materials science