2009World BridgesRequires access

Research of Key Construction Techniques for Separated Steel Box Girders of a Long Span Cable-Stayed Bridge Carrying Both Highway and Light Rail

Hongchun Qu

Open publisher page 0 citations

Abstract

The main navigable span bridge of Shanghai Changjiang River Bridge is a steel box girder cable-stayed bridge with double pylons,double cable planes and with span arrangement(92+258+730+258+92) m and the bridge is designed as a 5-span continuous full floating system.The main girders of the bridge are of the separated twin girders,each being a streamlined flat closed structure.In this paper,the key techniques for the manufacturing,the integral transportation and field installation of the girders are presented.

About this research paper

What this paper is about

The main navigable span bridge of Shanghai Changjiang River Bridge is a steel box girder cable-stayed bridge with double pylons,double cable planes and with span arrangement(92+258+730+258+92) m and the bridge is designed as a 5-span continuous full floating system.The main girders of the bridge are of the separated twin girders,each being a streamlined flat closed structure.In this paper,the key techniques for the manufacturing,the integral transportation and field installation of the girders are presented.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main navigable span bridge of Shanghai Changjiang River Bridge is a steel box girder cable-stayed bridge with double pylons,double cable planes and with span arrangement(92+258+730+258+92) m and the bridge is designed as a 5-span continuous full floating system.The main girders of the bridge are of the separated twin girders,each being a streamlined flat closed structure.In this paper,the key techniques for the manufacturing,the integral transportation and field installation of the girders are presented.

Key concepts: Bridge (graph theory), Girder, Span (engineering), Structural engineering, Engineering, Box girder, Beam bridge, Key (lock)

Related papers

Back to paper searchBrowse research topicsOriginal source
Research of Key Construction Techniques for Separated Steel Box Girders of a Long Span Cable-Stayed Bridge Carrying Both Highway and Light Rail — Research Paper | ScholarLens