Technical and Economical Analysis of No Bypass Wet FGD

Cpi Yuanda

Open publisher page 0 citations

Abstract

In order to achieve a fundamental and effective control of SO2,to resolve the problems of low availability and instability of the flue gas desulfurization(FGD) plant installed at the coal-fired power plant,it is imperative to cancel bypass duct.In this article after the author makes an analysis on the advantages of no bypass FGD plant and common failures of conventional wet FGD plant(with bypass),and also a comparision between a 2×600 MW FGD plant with no bypass and a conventional 2×660 MW FGD project,the technical and economic characteristics is clear.The result shows that FGD plant with no bypass may eliminate the failure points of booster fan,flue gas heat exchanger(GGH) and inlet damper,and may help improve the safety of the boiler and the reliability of the FGD system.Therefore,FGD plant with no bypass is feasible in economy.

About this research paper

What this paper is about

In order to achieve a fundamental and effective control of SO2,to resolve the problems of low availability and instability of the flue gas desulfurization(FGD) plant installed at the coal-fired power plant,it is imperative to cancel bypass duct.In this article after the author makes an analysis on the advantages of no bypass FGD plant and common failures of conventional wet FGD plant(with bypass),and also a comparision between a 2×600 MW FGD plant with no bypass and a conventional 2×660 MW FGD project,the technical and economic characteristics is clear.The result shows that FGD plant with no bypass may eliminate the failure points of booster fan,flue gas heat exchanger(GGH) and inlet damper,and may help improve the safety of the boiler and the reliability of the FGD system.Therefore,FGD plant with no bypass is feasible in economy.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to achieve a fundamental and effective control of SO2,to resolve the problems of low availability and instability of the flue gas desulfurization(FGD) plant installed at the coal-fired power plant,it is imperative to cancel bypass duct.In this article after the author makes an analysis on the advantages of no bypass FGD plant and common failures of conventional wet FGD plant(with bypass),and also a comparision between a 2×600 MW FGD plant with no bypass and a conventional 2×660 MW FGD project,the technical and economic characteristics is clear.The result shows that FGD plant with no bypass may eliminate the failure points of booster fan,flue gas heat exchanger(GGH) and inlet damper,and may help improve the safety of the boiler and the reliability of the FGD system.Therefore,FGD plant with no bypass is feasible in economy.

Key concepts: Power station, Waste management, Boiler (water heating), Engineering, Flue gas, Retrofitting, Flue-gas desulfurization, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Technical and Economical Analysis of No Bypass Wet FGD — Research Paper | ScholarLens