Canceling gas bypass in FGD of Guohua Sanhe Power Plant

Feng Qian-jun

Open publisher page 0 citations

Abstract

Guohua Sanhe Power Plant Phase II Project is the first to cancel gas bypass in FGD and use the new technology of gas tower integration, which is a self-developed FGD core technology. The factors influencing the design and operation of FGD system after canceling the gas bypass were analyzed, based on this, the countermeasures were proposed. During the start-up, shut-down and accident conditions, the flue gas will still enter in the absorber for desulphurization then it is discharged to atmosphere through cooling tower. Thus can reduce the air pollution, prevent the stopping of FGD installation without permission, and provide technical support for the real-time supervising of environment protection.

About this research paper

What this paper is about

Guohua Sanhe Power Plant Phase II Project is the first to cancel gas bypass in FGD and use the new technology of gas tower integration, which is a self-developed FGD core technology. The factors influencing the design and operation of FGD system after canceling the gas bypass were analyzed, based on this, the countermeasures were proposed. During the start-up, shut-down and accident conditions, the flue gas will still enter in the absorber for desulphurization then it is discharged to atmosphere through cooling tower. Thus can reduce the air pollution, prevent the stopping of FGD installation without permission, and provide technical support for the real-time supervising of environment protection.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Guohua Sanhe Power Plant Phase II Project is the first to cancel gas bypass in FGD and use the new technology of gas tower integration, which is a self-developed FGD core technology. The factors influencing the design and operation of FGD system after canceling the gas bypass were analyzed, based on this, the countermeasures were proposed. During the start-up, shut-down and accident conditions, the flue gas will still enter in the absorber for desulphurization then it is discharged to atmosphere through cooling tower. Thus can reduce the air pollution, prevent the stopping of FGD installation without permission, and provide technical support for the real-time supervising of environment protection.

Key concepts: Engineering, Waste management, Power station, Flue gas, Shut down, Process engineering, Electrical engineering