Engineering Practice in Blasting Excavation of Underground Workshop′s Rock Anchor Beam in Complex Conditions
Ping An
Abstract
Ping An
Abstract
In the excavation of underground workshop′s rock anchor beam for the Bailianhe Hydropower Station,the zoning and stepping excavation to protect area was used according to the characteristics of the geological structure.The optimal excavation scheme and blasting parameters were determined through the optimal blasting parameters and the optimal excavation scheme to proceed field test of various plans.The quality of formed rock bench have been obtained.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the excavation of underground workshop′s rock anchor beam for the Bailianhe Hydropower Station,the zoning and stepping excavation to protect area was used according to the characteristics of the geological structure.The optimal excavation scheme and blasting parameters were determined through the optimal blasting parameters and the optimal excavation scheme to proceed field test of various plans.The quality of formed rock bench have been obtained.
Key concepts: Excavation, Rock blasting, Mining engineering, Geotechnical engineering, Hydropower, Drilling and blasting, Geology, Engineering