Optimization and Implementation on Blasting Excavation of Underground Workshop's Rock Anchor Beam
Guo Pei-hua
Abstract
Guo Pei-hua
Abstract
In excavation of underground workshop's rock anchor beam for Lashiwa Hydropower Station,the zoning and stepping excavation was used to protect area.The optimal excavation scheme and blasting parameters were determined through adjusting the inclination of smooth blasting holes,launching the field test by various plans,and proceeding the sonic test of rock destroy circle by blasting.The quality of formed rock benchis in agreement with design desire.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In excavation of underground workshop's rock anchor beam for Lashiwa Hydropower Station,the zoning and stepping excavation was used to protect area.The optimal excavation scheme and blasting parameters were determined through adjusting the inclination of smooth blasting holes,launching the field test by various plans,and proceeding the sonic test of rock destroy circle by blasting.The quality of formed rock benchis in agreement with design desire.
Key concepts: Excavation, Rock blasting, Mining engineering, Geology, Geotechnical engineering, Hydropower, Rock mass classification, Engineering