Blasting experiments and study of rock bench excavation of rockwall crane beam of the left bank underground workshop of certain hydroelectric plant
Ju Zhou
Abstract
Ju Zhou
Abstract
For desired blasting effects,different blasting parameters are adopted in the experiments of vertical holes and acclivitous holes smooth blasting in integrated and broken zones by engineering analogy.A set of optimized construction procedure and blasting parameters are set down by comparison of different experiments and analysis of blasting vibration monitoring and broken rock zone tests.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
For desired blasting effects,different blasting parameters are adopted in the experiments of vertical holes and acclivitous holes smooth blasting in integrated and broken zones by engineering analogy.A set of optimized construction procedure and blasting parameters are set down by comparison of different experiments and analysis of blasting vibration monitoring and broken rock zone tests.
Key concepts: Rock blasting, Excavation, Hydroelectricity, Geotechnical engineering, Engineering, Mining engineering, Geology, Electrical engineering