An Assessment on the Traffic Transfer at the Area of Railway Passenger Station
Bai Li-qiong
Abstract
Bai Li-qiong
Abstract
Based on the problems of the traffic transfer at the area of railway passenger station, this paper analyzes the situation of Beijing railway station and points out the existing disadvantages as follows:(1)The transfer distances to the subway is too long; (2)the design of bus stations is unreasonable;(3)the passenger and the motor vehicle flows at the square in front of the railway station are jumbled. According to the successful experiences of transport junction overseas, the paper advances some ideas of how to improve the traffic connection at the railway passenger station in China,and puts forward a design plan for the similar stations.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the problems of the traffic transfer at the area of railway passenger station, this paper analyzes the situation of Beijing railway station and points out the existing disadvantages as follows:(1)The transfer distances to the subway is too long; (2)the design of bus stations is unreasonable;(3)the passenger and the motor vehicle flows at the square in front of the railway station are jumbled. According to the successful experiences of transport junction overseas, the paper advances some ideas of how to improve the traffic connection at the railway passenger station in China,and puts forward a design plan for the similar stations.
Key concepts: Transfer station, Beijing, Transport engineering, Transfer (computing), Plan (archaeology), Engineering, Subway station, Passenger transport