2009•Tunnel ConstructionRequires access

Construction Technology of Earth Pressure Balance Shield Machine Crossing a River

Wei Dai

Open publisher page 0 citations

Abstract

The left tube and the right tube of the shield tunnel on Guangzhou Metro Line 6(Datansha Station-Ruyifang Station) crosses Pearl River once respectively.During the construction,such measures as the application of earth pressure balance mode,boring parameters optimization,controlling of muck quantity,grouting quantity,position of shield machine and boring speed and muck improvement are adopted to ensure that the shield machine successfully crosses over the Pear River.

About this research paper

What this paper is about

The left tube and the right tube of the shield tunnel on Guangzhou Metro Line 6(Datansha Station-Ruyifang Station) crosses Pearl River once respectively.During the construction,such measures as the application of earth pressure balance mode,boring parameters optimization,controlling of muck quantity,grouting quantity,position of shield machine and boring speed and muck improvement are adopted to ensure that the shield machine successfully crosses over the Pear River.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The left tube and the right tube of the shield tunnel on Guangzhou Metro Line 6(Datansha Station-Ruyifang Station) crosses Pearl River once respectively.During the construction,such measures as the application of earth pressure balance mode,boring parameters optimization,controlling of muck quantity,grouting quantity,position of shield machine and boring speed and muck improvement are adopted to ensure that the shield machine successfully crosses over the Pear River.

Key concepts: Muck, Shield, Engineering, Tube (container), Lateral earth pressure, Pearl, Geotechnical engineering, Mining engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Technology of Earth Pressure Balance Shield Machine Crossing a River — Research Paper | ScholarLens