Construction Technology of Earth Pressure Balance Shield Machine Crossing a River
Wei Dai
Abstract
Wei Dai
Abstract
The left tube and the right tube of the shield tunnel on Guangzhou Metro Line 6(Datansha Station-Ruyifang Station) crosses Pearl River once respectively.During the construction,such measures as the application of earth pressure balance mode,boring parameters optimization,controlling of muck quantity,grouting quantity,position of shield machine and boring speed and muck improvement are adopted to ensure that the shield machine successfully crosses over the Pear River.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The left tube and the right tube of the shield tunnel on Guangzhou Metro Line 6(Datansha Station-Ruyifang Station) crosses Pearl River once respectively.During the construction,such measures as the application of earth pressure balance mode,boring parameters optimization,controlling of muck quantity,grouting quantity,position of shield machine and boring speed and muck improvement are adopted to ensure that the shield machine successfully crosses over the Pear River.
Key concepts: Muck, Shield, Engineering, Tube (container), Lateral earth pressure, Pearl, Geotechnical engineering, Mining engineering