2011•Petroleum Engineering ConstructionRequires access

Application of Ground Pressure Balance Method in Receiving Shield Machine Stage of Tunneling Operation in Fine Sand Stratum

Xiaoye Li

Open publisher page 0 citations

Abstract

In order to enable a shield machine to come out from fine sand stratum in tunneling operation,the methods of filling water into receiving well to the water level as the same as that of the Yangtze River and injecting sand of 6 m depth into the well are used.These methods can keep ground water pressure balance between the receiving well and the stratum so as to avoid water and sand gushing as the tunnel run-through.Application of the ground pressure balance method in Anqing Yangtze River Crossing Project in receiving shield machine phase is described in this paper including construction principle,characteristics,process,operation detailed rules,practical effect,reason analysis and technical measures.

About this research paper

What this paper is about

In order to enable a shield machine to come out from fine sand stratum in tunneling operation,the methods of filling water into receiving well to the water level as the same as that of the Yangtze River and injecting sand of 6 m depth into the well are used.These methods can keep ground water pressure balance between the receiving well and the stratum so as to avoid water and sand gushing as the tunnel run-through.Application of the ground pressure balance method in Anqing Yangtze River Crossing Project in receiving shield machine phase is described in this paper including construction principle,characteristics,process,operation detailed rules,practical effect,reason analysis and technical measures.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to enable a shield machine to come out from fine sand stratum in tunneling operation,the methods of filling water into receiving well to the water level as the same as that of the Yangtze River and injecting sand of 6 m depth into the well are used.These methods can keep ground water pressure balance between the receiving well and the stratum so as to avoid water and sand gushing as the tunnel run-through.Application of the ground pressure balance method in Anqing Yangtze River Crossing Project in receiving shield machine phase is described in this paper including construction principle,characteristics,process,operation detailed rules,practical effect,reason analysis and technical measures.

Key concepts: Stratum, Shield, Yangtze river, Geotechnical engineering, Stage (stratigraphy), Engineering, Groundwater, Mining engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Application of Ground Pressure Balance Method in Receiving Shield Machine Stage of Tunneling Operation in Fine Sand Stratum — Research Paper | ScholarLens